Phase-by-Phase Renovation Execution
Orderly trade sequencing ensures high-quality execution without costly rework:
- Phase 1: Permits & Approvals — Obtaining developer NOCs and security access passes.
- Phase 2: Demolition — Controlled wall removal and waste cart-away.
- Phase 3: MEP Infrastructure — Running PPR pipes, electrical conduit, and AC ducting in bare walls.
- Phase 4: Waterproofing & Screeding — Wet-area membrane tanking and 24-hour flood testing.
- Phase 5: Tiling & Ceilings — Precision porcelain floor laying and gypsum ceiling installation.
- Phase 6: Paint & Handover — Jotun decorative painting, fixture installation, and client snagging.